Transportation - Dumpsters & Moving Pods
Need a dumpster or moving pod?
- A Traffic Control Permit (costing $31 for the length of the permit) is required to place a moving pod or dumpster on the shoulder of the road
- Every moving pod or dumpster must have four (4) lighted Type I barricades, one for each corner (Salt Lake City does not provide barricades)
- A pod or dumpster may also require a Parking Permit if there is restricted parking at the site - i.e. parking meter, 2 hour parking signs, residential parking areas, etc. (additional fees may be required if this is the case)
- A Public Right-of-Way Permit from the Engineering Division is also required for pods and dumpsters (please call 801-535-6248)
To apply for a Traffic Control Permit, please come to the Transportation Division permits office located at 349 S. 200 E., Suite 150.